A Bundle is already in your cart
You can only have one active bundle against your account at one time.
If you wish to purchase a different bundle please remove the current bundle from your cart.
You have unused credits
You still have credits against a bundle for a different licence. Once all of your credits have been used you can purchase a newly licenced bundle.
If you wish to purchase a different bundle please use your existing credits or contact our support team.
02:01
Hydropower project under CPEC generates clean-green energy
STORY: Hydropower project under CPEC generates clean-green energy
SHOOTING TIME: Recent footage
DATELINE: June 8, 2024
LENGTH: 00:02:01
LOCATION: Islamabad
CATEGORY: SOCIETY
SHOTLIST:
1. STANDUP (English): ALI JASWAL, Xinhua reporter
2. SOUNDBITE (Urdu): JAFAR KAZMI, Site engineer at the dam
3. various of the dam
STORYLINE:
STANDUP (English): ALI JASWAL, Xinhua reporter
"Right now, I am present at the dam of the Suki Kinari (SK) Hydropower Project, located on Kunar River in Western Himalayas in Pakistan's northwest Khyber Pakhtunkhwa province. This is the biggest hydropower project under the China-Pakistan Economic Corridor (CPEC) framework. This is the first hydropower project which has used a rockfill dam. It's a very cost-effective technology as it consumes very less cost on the construction."
SOUNDBITE (Urdu): JAFAR KAZMI, Site engineer at the dam
"In a concrete dam, due to stages and steps, the water stoppers have to be put, which generally create seepage.
However, the rockfill dam is better than concrete because in this we have a benefit that it reduces the cost, and from the safety point of view, it's a better dam, because, in this rockfill dam, the downstream area has a whole drainage body, which saves it from any sort of seepage or in case of any crack that might occur in the control section or asphalt, it's not going to affect the dam because if any water flows from them, it would go into the drainage body area. That makes it safer than an ordinary dam."
SK is a diversion-type hydropower project featuring a high head and long tunnel.
The main structures of the project include a dam, spillway, power intake, headrace tunnel, surge shaft, penstock, underground powerhouse, tailrace tunnel, and access tunnel.
Xinhua News Agency correspondents reporting from Islamabad.
(XHTV)
Categories
From the blog
Stories not Stock: 3 Reasons Why You Should Use UGC Instead of Stock Video
Video content is an essential part of a brand’s marketing strategy, and while stock footage has been a reliable go-to in the past, forward-thinking companies are looking to user-generated content for their video needs.
View post