00:18

Asia's first cylindrical FPSO facility arrives at working area

Content Partner Cover Image
Content Partner Profile Image
Uploaded by a Newsflare content partner

Buy video

STORY: Asia's first cylindrical FPSO facility arrives at working area
SHOOTING TIME: May 12-29, 2024
DATELINE: May 31, 2024
LENGTH: 00:00:18
LOCATION: TIANJIN, China
CATEGORY: MARKET

SHOTLIST:
1. various of Haikui No. 1

STORYLINE:

Asia's first cylindrical floating, production, storage, and offloading (FPSO) facility has arrived at its working area in China's Pearl River Estuary Basin.

Haikui No. 1 is Asia's first cylindrical floating, production, storage, and offloading (FPSO) facility.

It has arrived at its working area in the Pearl River estuary basin.

Designed and built by China, Haikui No. 1 was completed and delivered in Qingdao last month.

With a maximum displacement of 100,000 tons and storage capacity of 60,000 tons of oil, the facility is capable of operating for 15 years at sea without returning to dock.

Xinhua News Agency correspondents reporting from Tianjin, China.
(XHTV)

Categories

Tags

From the blog

Stories not Stock: 3 Reasons Why You Should Use UGC Instead of Stock Video

Video content is an essential part of a brand’s marketing strategy, and while stock footage has been a reliable go-to in the past, forward-thinking companies are looking to user-generated content for their video needs.

View post
Content Partner Cover Image
Content Partner Profile Image
Uploaded by a Newsflare content partner

Buy video